The BIM Execution Planning Guide is being developed through a structured process which includes the following steps:
- Review of available literature and resources
- Development of interview questions to identify current and future uses of BIM from industry experts
- Conducting interviews to identify BIM uses
- Analyzing the industry interviews through detailed content analysis. The result of this process is a list of the BIM uses along with preliminary information regarding the uses.
- Development of interview questions to investigate each BIM use.
- Conducting interviews to gain further information about each BIM use.
- Compiling BIM Use information pages from the interview results and the
- Develop the BIM Execution Planning design process from process modeling concepts.
- Identify BIM Execution Plan content through an analysis of industry interviews and an analysis of existing and proposed execution planning structures.